Concrete Calculator
Volume of concrete for a slab or footing.
| Volume | 40.00 cu ft |
| With allowance | 44.00 cu ft(10% extra) |
| Cubic yards | 1.63 cu yd(how ready-mix is ordered) |
| Cubic metres | 1.25 m³ |
| 80 lb bags needed | 74 bags(for mixing by hand) |
| Ready-mix cost | $244 |
Results update instantly and are computed entirely in your browser. For general information and planning only — not engineering, structural or code advice.
About the concrete calculator
Concrete is ordered by volume, priced by the cubic yard or cubic metre, and once it is on site there is no going back — you cannot add more halfway through a pour without creating a cold joint. That is why a concrete estimate is worth doing twice, and why every experienced builder adds a margin rather than ordering exactly what the geometry suggests. The geometry itself is simple for a slab: length times width times thickness, with the thickness converted from inches to feet so the units agree. A four-inch slab over ten by twelve feet is forty cubic feet, which is about one and a half cubic yards. Footings, post holes and steps are the same calculation applied to a different shape; break a complicated pour into simple boxes, work out each one and add them together. The margin matters more than the maths. Concrete is lost to uneven subgrade, formwork that bows under the weight, spillage and the small amount left in the chute. Five to ten per cent extra is typical, and it is far cheaper than a short load, which may mean a second delivery charge or a weak, patched edge. Running slightly over is normal and the surplus can be used for a small pad. This calculator gives the volume in cubic feet, cubic yards and cubic metres, and estimates the number of eighty-pound bags if you are mixing by hand rather than ordering ready-mix. Mixing by hand is only sensible for small jobs — a cubic yard is well over a tonne and more than sixty bags. Confirm the subgrade depth and any reinforcement with your supplier before ordering.
This calculator returns estimates for planning and general information only. It is not engineering, architectural, structural, electrical or code advice, and it cannot replace a qualified professional who has seen the site. Material quantities depend on the actual dimensions, the product you buy and local building codes, so confirm the figures before ordering materials or starting work, and always follow local regulations.
Common questions
How much concrete does a slab need?
Volume is length times width times thickness, with the thickness converted into feet first — a four-inch slab is one third of a foot. A twelve by ten foot slab at four inches is forty cubic feet, or about one and a half cubic yards. The calculator gives both units so you can compare bags with a delivered load.
How many bags of concrete is a yard?
Roughly sixty bags of the common sixty-pound mix, or forty-five of the eighty-pound size, per cubic yard. Bags make sense for post holes and small pads; beyond about a cubic yard a delivered mix is usually cheaper, faster and more consistent than mixing dozens of bags by hand.
How much extra should I order?
Five to ten percent for a flat slab or footing, and more where the formwork is irregular or the ground is uneven. Running short mid-pour is far more expensive than a small surplus, because a cold joint between two batches is a weak point. Order the waste allowance deliberately rather than hoping.